STEM Singh logoSikhSigma/GRID LIVEBy STEM Singh · © Jasjeet Singh Channa
Connecting to grid feeds GB system · UK asset catalogueRefreshes every 5 minutes
TRANSMISSION DEMAND PROXY
—GW
Elexon FUELINST · awaiting data
DOMESTIC METERED GENERATION
—GW
Excludes imports · excludes embedded estimates
NET INTERCONNECTOR FLOW
—GW—
Positive into GB · negative out
GRID CARBON INTENSITY
—gCO₂/kWh—
NESO · awaiting data
SYSTEM FREQUENCY
—Hz
Elexon · awaiting data
GREAT BRITAIN & CONNECTED MARKETSSTEM Singh logo SikhSigma / GRID LIVE · By STEM Singh

Power, in place.

Operational assets ≥100 MW · distribution regions

+ Geographic assets · schematic interconnectors — sites shown
© Jasjeet Singh Channa · By STEM Singh
Supported by National Energy SO Open Data · Contains BMRS data © Elexon Limited 2026
03 / THE CARBON OUTLOOK

Next 24 hours GB forecast

Loading half-hourly forecast…

LOWEST FORECAST— gCO₂/kWhAwaiting forecast
SikhSigma / GRID LIVE · By STEM Singh

Good engineering starts
with clear definitions.

An independent educational view of Britain's electricity system. Live system metrics cover GB; the asset catalogue includes UK projects. Northern Ireland is outside the GB synchronous system.

What the numbers mean

Transmission demand proxy
Elexon FUELINST total generation outturn, used as a proxy for rolling transmission-system demand. It is not total UK electricity consumption. Embedded generation and pumping/export conventions differ from national demand series.
Domestic metered generation
Sum of non-interconnector FUELINST fuel categories at one measurement time. Includes reported pumped-storage discharge, excludes pumping load and much embedded wind and solar. The mix percentages use positive domestic metered output as the denominator.
Interconnectors
Signed flows from the same FUELINST snapshot. Positive means into GB. Map lines connect indicative country endpoints; they are schematic, not surveyed cable routes.
Carbon intensity
NESO Carbon Intensity API. National estimated actual is preferred; forecast is labelled when actual is unavailable. Regional values are modelled forecasts, not direct measurements of local electricity. Whole-system mix uses the Carbon Intensity API half-hourly percentage mix, including embedded estimates; no MW is inferred from those percentages.
Assets & capacity
Official REPD and DUKES snapshots. Installed electrical MW are catalogue values, not live site output. BESS is storage, not a primary energy source. MW is power; MWh is energy. Planning status can lag reality and records may include related/co-located projects; do not add all capacities as a fleet total.
Network geography
NESO's approximate 2024 DNO licence-area boundaries. All source vertices are preserved, with matching land and region geometry. These are service territories, not live power-flow zones. Operator names in source data may be historical; current group labels are provided in the directory.

Sources & reuse

Contains public sector information licensed under the Open Government Licence v3.0. Contains BMRS data © Elexon Limited copyright and database right 2026. No affiliation with NESO, Elexon, DESNZ or network operators.

© Jasjeet Singh Channa · By STEM Singh

Code: MIT licence. Data retains its separate source licences. Original layout and identity by STEM Singh.

SEARCH ALIASES / YOUR DEVICE

Add a company search alias

These are your search notes, stored in this browser and labelled as user supplied. Official operator records stay unchanged.

© Jasjeet Singh Channa